Alta USA

image gradient overlay
Alta hero
Ecosign has also been involved in several base area planning projects at Alta. We developed programming and site design of the new Buckhorn building which was built in 2013 and contains skier lockers, meeting rooms, administrative offices and new shop for the Lift and Snowmaking Maintenance departments. Total Cost: $3.5 million. We have worked on several pedestrian and vehicular circulation enhancement plans in both the Wildcat and Albion Base Area.
Ecosign has continued working on plans to develop the Grizzly Gulch ski terrain on private land owned by Alta to enable a four season connection with the Solitude and Brighton ski areas in Big Cottonwood Canyon.

"Lorem ipsum dolor sit amet, consectetur adipiscing elit. Cras facilisis, quam eget consectetur bibendum, justo arcu maximus velit, vel sollicitudin massa ante vel arcu. Cras tincidunt nibh massa, in tincidunt enim tempus ac. Maecenas lobortis ut diam vitae maximus. Cras sagittis lobortis ultrices.”

Onno e1421097107474
Client Name Client Company
a shovel shovel line Follow us on Instagram Follow us on Linkedin Follow us on Youtube Follow us on Facebook Follow us on Twitter