Project Details | |
---|---|
Location | Andermatt, Switzerland |
Client | Andermatt Alpine Destination Company AG |
Master Plan Completed | 2018 |
Project Status | Completed |
Services Rendered |
Regional Tourism Planning |
Ecosign prepared the Preferred Master Plan Concept for the Andermatt-Sedrun Ski Circus in 2009 connecting the areas of Hospental, Gemsstock, Nätschen and Sedrun and the detailed Ski and Resort Master Plan completed in 2014. The Master Plan provided detailed planning of lifts, pistes, connecting ski routes and the required village staging facilities. The overall Resort Area Master Plan included the analysis of the tourist overnight accommodation capacity, parking, access to each skiing region and importantly, convenient lift and piste connections between each of the four primary winter sports regions. This plan also includes detailed programming for skier services both in the base staging portals and the on-mountain restaurants and proposals for day skier portals with parking and/or train access. Construction commenced in 2015 and was completed in December, 2018. Total project cost of 130 million CHF which includes 120 km of pistes and 8 Lifts.
- Berganlagen Masterplan Andermatt-Oberalppass
- Oberalppass with Sedrun Connection
- Schneehüenerstock Double Top Terminal
- Nätschen Mid-Station with Beginner Zone